Coordinating an acceptable transfer, Part 3:
The receiving company
By Randy Winton
Published: November 23rd, 2009
In Part 2 of this series, the sending company toolroom manager’s
responsibilities in a tool transfer were outlined. Now, here are some
considerations for the receiving company and what its team must do
when the tooling arrives on its dock.
Being on the receiving end of a tool transfer can be anything from a
positive opportunity to a horrible chain of events. There will be some
challenges and some puzzles to piece together, so it’s wise to
approach the just-delivered tooling systematically and with some
measure of caution.
Those who have received transferred tools have learned many a hard
lesson by assuming too much about a mold. So, we recommend the
following steps:
-
Upon receiving the tooling, the toolroom manager needs to make an
inventory of what has been sent to him. Are there prints? What about a
mold book containing a molding machine processing data sheet,
maintenance records, mold and part drawings, and other valuable data?
Are there any last shots of molded parts? How about a runner? All must
be gathered, organized, and communicated early to management.
-
Once this inventory has been taken, the setup team needs to get
involved to look over the molds for any obvious issues while it is
still on the bench. This is always easier than climbing through the tiebars or squatting alongside a mold while attempting to peer inside
it looking for slides or cavity numbers. Also, because some tools are
rather complex and require special hookups, establishing a plan with
the setup team early on will save confusion and stress later.
-
Rather than performing an initial disassembly and cleaning upon the
tool’s arrival, you can gain valuable insights by sampling the tool
“as is” in order to discover its true condition upon receipt. If mold
drawings are available, they can be a great benefit by providing a
cross-section view for internal mold actions. The process engineer
should also be on hand to review how the molds operate—check the
drawings, see how the molds fill, and look for any basic issues. Aside
from that, however, just opening the molds at their parting lines and
wiping them off is usually sufficient before getting them into the
presses for a trial run.
-
Once this initial review phase is completed, it’s time to bring in
the QC department, while updating the molding department to coordinate
sampling.
-
Dry cycle the molds first to ensure that all actions are working
and that the open-close functions are working correctly. The process
engineer should then take over and set proper parameters, reviewing
the parts for samples to be sent to QC for first article inspection.
If the parts shot after dry cycling are not acceptable to QC, the mold
should come out of the press to be disassembled, revised, and
completely cleaned. After this, enough initial experience with the
tool should have been gained to predict when it might be put into
service for production.
-
Next, a DOE (Design of Experiments) is conducted to establish the
ideal settings for each mold to operate within the optimal processing
window. Then, parts should be captured for a CPK study by QC. The
molds would normally be shut down at this point until the results of
the CPK study are available. The data returned will determine what the
next steps are, but these could include resampling; cleaning, repair,
and resampling; and release to production. This process can take
anywhere from a few hours to several days, depending on how many
surprises present themselves.
At this point, a new mold file should be initiated. Detailed notes
about the results of the sampling and what will be done to correct any
defects will be included. Often there are no mold drawings included in
the transfer, so the receiving company may do an actual cross-section
of the mold design, or at a minimum, a Visio representative drawing,
showing all components and critical dimensions.
Given everything that has to happen to get a single mold running, it’s
clear there are many considerations and reactive steps that will
occur. When dozens of tools are involved, and perhaps also a
salesman’s promise that the new work will be in production
immediately, the role of the toolroom manager is even more daunting.
Methodical actions, tracked within a documentation system, will reduce
the surprises and hazards downstream. It’s the classic
tortoise-and-the-hare scenario, and the need for a systematic approach
by the toolroom manager must be understood by all parties involved in
the transfer.
Coming next: Steps the OEM can take to accomplish a successful tool
transfer.
More on this topic:
What are the hidden risks of tool transfers? Part
3: Noninstrumented tool transfers
Author
Randy Winton is
global training manager at
ToolingDocs.
Reprinted with permission from the November issue of Injection Molding Magazine.
© Copyright 2009, Canon Communications LLC
Be a TPN Guest Speaker! If you'd like to
submit an article for a future issue of the
TPN, please contact Editor
Cyndi Kustush at
editor@tooling-product-news.com for
editorial guidelines. Be sure to provide complete contact information
and any proposed topics or ideas.